Road Projects
2025 PROPOSED ROAD PROJECTS
- Blevins Road- West Liberty to the bottom of the hill (Rebuild) – 5,385 ft. – Estimated 2,300 Tons of Material – $169,000 +/-
- Vinyard Road- Rt. 24 to Althouse School Road (Rebuild) – 1,100 ft. – Estimated 400 Tons of Material- $35,000 +/-
- Zeigler School Road (Overlay) – 6,920 ft. – Estimated 2,400 Tons of Material- $200,000 +/-
- Base Repair- Estimated 250 Tons Material- $18,000 +/-
- Level Coat- Estimated 400 Tons Material- $35,000 +/-